Dynamic balancing for pump impeller 045-P-101A/B/C/D
Dynamic balancing for pump impeller 045-P-101A/B/C/D meets G1.0 ISO 1940 standard
Other Projects
General Maintenance (DCSM)
On-line leak sealing for the water supply pipe for the absorber
Supplying flange facing, manpower supply service
Repair and maintenance for Turbine Unit 2
Repair/Overcome the vibration of Turbine Unit 1