Fabrication, installing and renovating ventilation system 11kV
Fabrication, installation and renovation of 11 kV room ventilation system:
- Processing and manufacturing pipe sections.
- Install pipe sections
Other Projects
Maintenance, repair of steam turbine U30401A
General Maintenance (DCSM)
Dynamic balancing for pump impeller 045-P-101A/B/C/D
Repairing, maintaining 41MW Steam turbine
Design, processing, manufacturing, and installation of rotary kiln body