Overhaul turbine, generator and auxiliary equipment Unit 2
Repair, maintenance, overhaul of turbine, generator and furnace auxiliary equipment No. 2:
- Turbine repair and maintenance: Disassemble, repair, maintain, alignment, reinstall.
- Blasting by aluminum powder to clean turbine rotors and diaphragms.
- Repair and maintenance of 60MW generator.
- Repair and maintenance of Stop valve, Steam Turbine Regulating Valve system.
- Repair and maintenance of oil pumps, oil coolers, etc.