Repair/Overcome the vibration of Turbine Unit 1

Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.

  • Adjust parameters of journal bearing 3,4.
  • Repairing pillow pedestals number 3, 4.
Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine turning-device - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Other Projects

Repair and install mechanical workshop

Repair and install mechanical workshop

View more
Overhaul turbine, generator and auxiliary equipment Unit 2

Overhaul turbine, generator and auxiliary equipment Unit 2

View more
Dynamic balancing for pump impeller 045-P-101A/B/C/D

Dynamic balancing for pump impeller 045-P-101A/B/C/D

View more
General Maintenance (DCSM)

General Maintenance (DCSM)

View more
Air dryer repair Unit 1,2

Air dryer repair Unit 1,2

View more
Heat exchanger flanges re-surfacing

Heat exchanger flanges re-surfacing

View more