Repair/Overcome the vibration of Turbine Unit 1

Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.

  • Adjust parameters of journal bearing 3,4.
  • Repairing pillow pedestals number 3, 4.
Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine turning-device - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Other Projects

Rental of high pressure pumps and operator - 2022

Rental of high pressure pumps and operator - 2022

Maintenance of the receiving pump system

Maintenance of the receiving pump system

View more
Provide cold cutting service for 24" pipes

Provide cold cutting service for 24" pipes

View more
Repairing, maintaining 41MW Steam turbine

Repairing, maintaining 41MW Steam turbine

View more
Maintenance, repair of steam turbine U30401A

Maintenance, repair of steam turbine U30401A

View more
Overhaul for Fuel Supply Pump System Flowserve PU201-203

Overhaul for Fuel Supply Pump System Flowserve PU201-203