Repair/Overcome the vibration of Turbine Unit 1
Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.
- Adjust parameters of journal bearing 3,4.
- Repairing pillow pedestals number 3, 4.
Other Projects
Providing Area 2 hydraulic bolt tightening service - TA 2023
Boiler repairing
Manufacturing, installing D600 steel pipes
Scaffolding rental for construction - DTP
Supplying flange facing, manpower supply service