Equipment, structure erection of Circulating Fluidized Bed Boiler 2x35T/H
- Erecting and dismantling scaffolding.
- Erection of steel structure.
- Install electrostatic precipitator.
- Install and align the fan.
- Install and align the pump, etc
Other Projects
Online Leak sealing for CO Coal Gas Pipeline
Overhaul turbine, generator and auxiliary equipment Unit 2
Repairing, maintaining 41MW Steam turbine
Repairing Boiler and auxiliary equipment
Aluminum blasting 600MW turbine